Model Ship Builder :: Forums :: Build Logs :: POB Build Logs |
|
<< Previous thread | Next thread >> |
Royal Louis 1780 Mamoli kit MV40 code 4006 1:90 |
Go to page 1 2 3 4 5 | |
Moderators: Winston, aew, bikepunk
|
Author | Post | ||
Charles |
| ||
![]() ![]() Registered Member #1923 Joined: Mon Nov 28 2011, 06:07pmPosts: 797 | Foremast construction Lower mast, topmast and topgallant and cable of the shrouds ![]() Laying yards ![]() Here the mainmast and foremast dry mount for now ![]() ![]() Next mizzenmast ![]() | ||
Back to top | | ||
jacknastyface2 |
| ||
![]() Registered Member #5239 Joined: Sat Apr 21 2018, 05:29pmPosts: 430 | Hi Charles, well, you have stayed with it despite my comments ![]() Keith. | ||
Back to top | | ||
NovaStorm |
| ||
![]() ![]() Registered Member #5618 Joined: Sat Sep 22 2018, 02:33pmPosts: 287 | Im with Keith ![]() ![]() | ||
Back to top | | ||
aew |
| ||
aew![]() ![]() ![]() Registered Member #1929 Joined: Wed Nov 30 2011, 03:05pmPosts: 2775 | Very nice work Charles. Looking at the plan, it looks as though that mizzen mast is going to have a lateen sail, mizzen course and stunsails. Now there's an unusual combination! | ||
Back to top | | ||
Charles |
| ||
![]() ![]() Registered Member #1923 Joined: Mon Nov 28 2011, 06:07pmPosts: 797 | Prepare the parts of the mizzen mat![]() Remake the chocks that are provided by new wooden one ![]() The platforms of combat posed and mast build ![]() Installation of stay cables ![]() ![]() Laying yards ![]() ![]() The 3 mats posed temporarily are ready to receive the rest of the rope I still have the mast of the bowsprit ![]() Clean up the disaster from my work table and set the RL aside again temporarily to start the Syren and Säo Miguel will work on the 3 ships alternately ![]() ![]() | ||
Back to top | | ||
Charles |
| ||
![]() ![]() Registered Member #1923 Joined: Mon Nov 28 2011, 06:07pmPosts: 797 | Bowsprit 7 Pieces mainly The construction is simple without major problem ![]() ![]() ![]() At the place where the mast enters the hull there is an opening which has been corrected with a ring. ![]() ![]() At this stage the mast are all complete but having already had this situation I revisit the set of all wiring to put all the hooks and accesory that will be needed later and avoided having to do them in the middle of the ropes. ![]() ![]() ![]() ![]() ![]() Here are the mast in place, they are rest 3 sheets 6-7 and 8 to do 6 will be mainly the stay and other wires and mast support cable ![]() ![]() | ||
Back to top | | ||
Slobodan |
| ||
![]() ![]() Registered Member #4425 Joined: Wed May 07 2014, 03:37pmPosts: 284 | What a beauty Charles. Awesome work on her. | ||
Back to top | | ||
jacknastyface2 |
| ||
![]() Registered Member #5239 Joined: Sat Apr 21 2018, 05:29pmPosts: 430 | Ditto to that Charles. There's an awful lot of work gone into her. Keith. [ Edited Tue Oct 29 2019, 04:12pm ] | ||
Back to top | | ||
Go to page 1 2 3 4 5 | |
Powered by e107 Forum System