Model Ship Builder :: Forums :: Build Logs :: POB Build Logs |
|
<< Previous thread | Next thread >> |
Santa Maria - Mantua - scale 1:50 modified kit semi scratch |
Go to page 1 2 3 4 5 6 7 8 9 10 | |
Moderators: Winston, aew, bikepunk
|
Author | Post | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Some full size pictures.![]() ![]() ![]() Zoltan | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Hello everybody,I don't have much update,last Saturday when I started drilling holes for the tree-nails on the poop deck I made a big mistake ,insted of drilling holes only on the planks with butt joints I was just keep drilling holes on each row of the planks,totally lack of focusing due to a headache on that morning when I woke up.I did not feel ok that day at all but I was keep pushing myself to work on the ship.So I ended up to rip all the planking not just on the poop deck but all the other decks too. I decided to replank again with a different wood,probably teak as my wood shipment arrived,currently testing walnut wood filler for tree-nails,posting pictures tomorrow. Zoltan | ||
Back to top | | ||
bensid54 |
| ||
![]() ![]() Registered Member #2957 Joined: Wed Jun 13 2012, 05:43amPosts: 962 | Sorry to hear that Zoltan, nothing worse than having to redo work you have already done due to a mistake. Hope the headache clears up too. | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | bensid54 wrote ... Sorry to hear that Zoltan, nothing worse than having to redo work you have already done due to a mistake. Hope the headache clears up too. thanks,just one day headache and more days headache to re-plank everything ![]() Zoltan | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Hello everybody,after two weeks waiting finally received my wood shipment,and did some tree-nailing experiment on teak with walnut wood filler. Walnut on the left and teak on the right. ![]() Teak on the bottom. ![]() ![]() Zoltan | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Hello everybody,it has been a while I posted but I was not sleeping,work was continuing ,actually planking the deck. | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | A little caulking trial,I used black marking pen.![]() | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Working on planking the poop deck with teak,caulking by black marking pen and black coloring crayon.![]() ![]() ![]() Zoltan [ Edited Sat Oct 08 2016, 03:15pm ] | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Forecastle deck![]() ![]() ![]() Zoltan | ||
Back to top | | ||
Zoltan |
| ||
![]() Registered Member #4779 Joined: Sat May 07 2016, 02:34amPosts: 201 | Quarter deck ![]() ![]() ![]() Zoltan | ||
Back to top | | ||
Go to page 1 2 3 4 5 6 7 8 9 10 | |
Powered by e107 Forum System